• info@ahalasoftware.com
  • +2348037174392,+1 347 703 4030
Ahala Software
Ahala Software
  • Home
    • Pages
      • Student Registration
      • Instructor Registration
      • FAQs
      • Terms and Conditions
  • Courses
    • Our Courses
    • Courses Grid
      • 3 Columns
      • 4 Columns
    • Become An Instructor
  • Webinars
    • All webinars
  • Blog
    • Blog Page
  • About
  • Contact
  • 0
  • Login
  • |
  • Register
    • Login
    • Register
Ahala Software
  • Home
    • Pages
      • Student Registration
      • Instructor Registration
      • FAQs
      • Terms and Conditions
  • Courses
    • Our Courses
    • Courses Grid
      • 3 Columns
      • 4 Columns
    • Become An Instructor
  • Webinars
    • All webinars
  • Blog
    • Blog Page
  • About
  • Contact

Company says manufacturing problem was behind wind turbine blade breaking off Nantucket Island

Ahala Software > Blog > News > Company says manufacturing problem was behind wind turbine blade breaking off Nantucket Island
  • July 25, 2024
  • News


NANTUCKET, Mass. — The maker of a massive wind turbine blade that broke apart off Nantucket Island and washed up on the beaches says a manufacturing problem was responsible.

GE Vernova CEO Scott Strazik said on an earnings call Wednesday that insufficient bonding at one of its factories in Canada was responsible for the blade coming apart and that there was no indication of a design flaw. As a result, the company will reinspect all 150 blades that had been made at the factory.

“To identify deviations, we are going to go and do this on every blade. Prudent, thorough process,” he told the call. “We’re not going to talk about the timeline today. We have work to do. But I have a high degree of confidence that we can do this.”

Parts of the blade, which is more than 100 meters (109 yards) long, began to fall into the ocean July 13 at the Vineyard Wind project and crews in boats and on beaches have been collecting truckloads of debris ever since. The company said that the debris consists of nontoxic fiberglass fragments and that any washing ashore are pieces of one square foot or less.

The federal Bureau of Safety and Environmental Enforcement said last week that operations at Vineyard Wind have been suspended until it can be determined whether the “blade failure” impacts other turbine blades on the development.

“As GE Vernova continues the investigation into the root cause of the damage to its blade, Vineyard Wind 1 remains focused on coordinating with the Bureau of Safety and Environmental Enforcement, assisting in the recovery of debris, and prioritizing the safety of personnel, local communities, and the environment,” Craig Gilvarg, a company spokesman, said in a statement.

Vineyard Wind is a joint venture between Avangrid and Copenhagen Infrastructure Partners and said no personnel or third parties were near the turbine when the damage occurred. It said in a statement that blade manufacturer and installation contractor GE “will now be conducting the analysis into the root cause of the incident.”

The development’s massive wind turbines began sending electricity to the grid this past winter. It said it will deploy trained individuals to collect the debris for the next several days



Source link

Post navigation

Previous Post
Next Post

Leave A Comment Cancel reply

All fields marked with an asterisk (*) are required

Recent Posts

  • Winning numbers drawn in Friday’s Mega Millions
  • Texas megachurch founder Robert Morris pleads guilty to child sex abuse charges
  • Delta jets have ‘low-speed collision’ on the ground at New York’s LaGuardia
  • 5 homes collapse into the surf of the Outer Banks as hurricanes rumble in Atlantic
  • Trump and Hegseth set to meet with hundreds of military leaders as speculation grows

Recent Comments

No comments to show.

Archives

  • October 2025
  • September 2025
  • August 2025
  • July 2025
  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024

Categories

  • Entertainment
  • Investment
  • Miscellaneous
  • News
  • Sports
  • World news

Recent Posts

  • Winning numbers drawn in Friday’s Mega Millions
    October 4, 2025
  • Texas megachurch founder Robert Morris pleads guilty to child sex abuse charges
    October 3, 2025
  • Delta jets have ‘low-speed collision’ on the ground at New York’s LaGuardia
    October 2, 2025

Categories

  • Entertainment
  • Investment
  • Miscellaneous
  • News
  • Sports
  • World news

Archives

  • October 2025
  • September 2025
  • August 2025
  • July 2025
  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024

Meta

  • Register
  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org

Ahala Software

Follow Us

Recent Posts

  • Winning numbers drawn in Friday’s Mega Millions
    October 4, 2025
  • Texas megachurch founder Robert Morris pleads guilty to child sex abuse charges
    October 3, 2025

Contact Us

  • Head Office Address:
    2753 Sexton Place,
    Bronx, New York 10469.
    United States of America.

  • info@ahalasoftware.com

  • +1 347 703 4030

Contact Us

  • Branch Office Address:
    39 Alfred Rewane Road Ikoyi, Lagos.

  • info@ahalasoftware.com

  • +2348037174392

© Copyright 2024. Ahala Software All Rights Reserved