• info@ahalasoftware.com
  • +2348037174392,+1 347 703 4030
Ahala Software
Ahala Software
  • Home
    • Pages
      • Student Registration
      • Instructor Registration
      • FAQs
      • Terms and Conditions
  • Courses
    • Our Courses
    • Courses Grid
      • 3 Columns
      • 4 Columns
    • Become An Instructor
  • Webinars
    • All webinars
  • Blog
    • Blog Page
  • About
  • Contact
  • 0
  • Login
  • |
  • Register
    • Login
    • Register
Ahala Software
  • Home
    • Pages
      • Student Registration
      • Instructor Registration
      • FAQs
      • Terms and Conditions
  • Courses
    • Our Courses
    • Courses Grid
      • 3 Columns
      • 4 Columns
    • Become An Instructor
  • Webinars
    • All webinars
  • Blog
    • Blog Page
  • About
  • Contact

Collapsed rail bridge gets first of two controlled blasts in clean up after severe flooding

Ahala Software > Blog > News > Collapsed rail bridge gets first of two controlled blasts in clean up after severe flooding
  • August 20, 2024
  • News


Half of a collapsed rail bridge connecting South Dakota and Iowa was blasted Monday in a controlled demolition, part of the process to remove the bridge months after it fell into the river, swollen from severe flooding

NORTH SIOUX CITY, S.D. — Half of a collapsed rail bridge connecting South Dakota and Iowa was blasted in a controlled demolition, part of the process to remove the bridge months after it fell into the river, swollen from severe flooding.

The steel bridge over the Big Sioux River connected North Sioux City, South Dakota, with Sioux City, Iowa. It was partially underwater after heavy rains in late June brought record high river crests in the two states, along with Minnesota and Nebraska.

The blast on the South Dakota side of the bridge, owned by BNSF Railway, occurred Monday morning, according to reports from broadcast station KTIV in Sioux City, Iowa. Officials established a perimeter on both sides of the river, closing nearby roads and advising people to stay away.

“At 9 a.m. local time, charges were successfully used to cut the bridge span into sections, allowing it to fall into the river for removal,” Kendall Sloan, BNSF communications director, said in a statement.

“The condition and position of the failed spans made controlled blasting the safest way to remove them,” Sloan added.

Sloan said crews will use a crane to remove the fallen pieces over the next week, and a second controlled blast will target the Iowa side of the bridge, likely in September.

Amy McBeth, public affairs director for BNSF, told KTIV that the controlled demolition needed to happen in two parts because a causeway is needed on both sides to allow the heavy equipment near the river.

The design process for a new bridge is underway and the rebuild is expected to take about nine months.



Source link

Post navigation

Previous Post
Next Post

Leave A Comment Cancel reply

All fields marked with an asterisk (*) are required

Recent Posts

  • Tesla sales plunge again in Europe as anger at Musk keeps buyers away
  • Judge orders new trial for Alabama man who has been on death row for 31 years
  • Oregon zoo owner indicted on more than 300 animal neglect charges
  • A Kansas City, Kansas, police officer has died after being struck by a fleeing driver
  • Pennsylvania must stop throwing out mail ballots over date errors, court rules

Recent Comments

No comments to show.

Archives

  • August 2025
  • July 2025
  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024

Categories

  • Entertainment
  • Investment
  • Miscellaneous
  • News
  • Sports
  • World news

Recent Posts

  • Tesla sales plunge again in Europe as anger at Musk keeps buyers away
    August 29, 2025
  • Judge orders new trial for Alabama man who has been on death row for 31 years
    August 28, 2025
  • Oregon zoo owner indicted on more than 300 animal neglect charges
    August 27, 2025

Categories

  • Entertainment
  • Investment
  • Miscellaneous
  • News
  • Sports
  • World news

Archives

  • August 2025
  • July 2025
  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024

Meta

  • Register
  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org

Ahala Software

Follow Us

Recent Posts

  • Tesla sales plunge again in Europe as anger at Musk keeps buyers away
    August 29, 2025
  • Judge orders new trial for Alabama man who has been on death row for 31 years
    August 28, 2025

Contact Us

  • Head Office Address:
    2753 Sexton Place,
    Bronx, New York 10469.
    United States of America.

  • info@ahalasoftware.com

  • +1 347 703 4030

Contact Us

  • Branch Office Address:
    39 Alfred Rewane Road Ikoyi, Lagos.

  • info@ahalasoftware.com

  • +2348037174392

© Copyright 2024. Ahala Software All Rights Reserved