• info@ahalasoftware.com
  • +2348037174392,+1 347 703 4030
Ahala Software
Ahala Software
  • Home
    • Pages
      • Student Registration
      • Instructor Registration
      • FAQs
      • Terms and Conditions
  • Courses
    • Our Courses
    • Courses Grid
      • 3 Columns
      • 4 Columns
    • Become An Instructor
  • Webinars
    • All webinars
  • Blog
    • Blog Page
  • About Us
  • Contact
  • |
  • Login
  • Register
    • Login
    • Register

Water pouring out of rural Utah dam through 60-foot crack, putting nearby town at risk

Ahala Software > Blog > News > Water pouring out of rural Utah dam through 60-foot crack, putting nearby town at risk
  • April 11, 2024
  • News


SALT LAKE CITY — Workers hurriedly tried to shore up a rural Utah dam after a 60-foot (18-meter) crack opened and sent water pouring into a creek and endangering the 1,700 residents of a downstream town.

State and local officials don’t think the Panguitch Lake Dam is in imminent danger of breaking open but have told the residents to be prepared to evacuate if conditions worsen. Lowering the reservoir to below the affected area will take several days, said Everett Taylor, an assistant state engineer for dam safety with the Utah Division of Water Rights.

About 2 feet (61 centimeters) of water remained above the crack as of Wednesday evening and they had covered nearly 45 feet (nearly 14-meters) of the crack with boulders, he said.

An ice sheet on the reservoir was pushing up against the dam, causing the top to crack and tilt downstream, with water gushing through the opening, Taylor said. The ice sheet has now pulled away from the dam and the top of the dam has tilted back, he said.

“We have made cuts across that ice sheet so we can relieve the pressure against the dam,” Taylor said.

A community meeting was scheduled for Wednesday to update and answer questions from residents in Panguitch, a town of about 1,800 people that is about 10 miles (16 kilometers) downstream from the dam. Another tiny town, Circleville, is farther downstream and faces a lower risk.

Local officials discovered the crack in the upper portion of the dam during an inspection Monday night and Utah state officials announced it to the public on Tuesday.

Water is being released at nearly 260 cubic feet (6.5 cubic meters) per second to draw down the reservoir below the crack, and large rocks are being trucked in and placed on the downstream side of the dam to support the wall. No rain is forecast until Saturday.

The dam was built in the late 1800s, but the the top portion that cracked was added to the top of the dam in the 1930s and 1940s. There were no previous concerns regarding the dam’s structural integrity, Taylor said.

“No one anticipated this,” he said, adding he is encouraged by the progress being made.

State officials called it a level 2 breach risk — a designation in the middle of the three-prong scale that means there is potential for dam failure.

“We are going to continue to focus on drawing the reservoir down, making sure the ice … we keep that off of the dam, and to continue to buttress or support this downstream side,” Taylor said.

___

Peterson reported from Denver.

___

The Associated Press receives support from the Walton Family Foundation for coverage of water and environmental policy. The AP is solely responsible for all content. For all of AP’s environmental coverage, visit https://apnews.com/hub/climate-and-environment



Source link

Post navigation

Previous Post
Next Post

Leave A Comment Cancel reply

All fields marked with an asterisk (*) are required

Recent Posts

  • How Democrats in America’s most Jewish city embraced a critic of Israel
  • McLaren driver Lando Norris wins Formula 1's Austrian Grand Prix
  • Longtime State Department spokesman, diplomat Richard Boucher, dies at 73
  • After decades in the US, Iranians arrested in Trump’s deportation drive
  • Winning numbers drawn in Saturday’s Powerball

Recent Comments

  1. Admin on The Curse
  2. Admin on Beverages History
  3. Admin on Expeditionary
  4. Admin on Only Words
  5. Admin on The Warmag

Archives

  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024

Categories

  • Entertainment
  • Investment
  • Miscellaneous
  • News
  • Sports
  • World news

Recent Posts

  • How Democrats in America’s most Jewish city embraced a critic of Israel
    June 29, 2025
  • McLaren driver Lando Norris wins Formula 1's Austrian Grand Prix
    June 29, 2025
  • Longtime State Department spokesman, diplomat Richard Boucher, dies at 73
    June 29, 2025

Categories

  • Entertainment
  • Investment
  • Miscellaneous
  • News
  • Sports
  • World news

Archives

  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024

Meta

  • Register
  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org

Ahala Software

Follow Us

Recent Posts

  • How Democrats in America’s most Jewish city embraced a critic of Israel
    June 29, 2025
  • McLaren driver Lando Norris wins Formula 1's Austrian Grand Prix
    June 29, 2025

Contact Us

  • Head Office Address:
    2753 Sexton Place,
    Bronx, New York 10469.
    United States of America.

  • info@ahalasoftware.com

  • +1 347 703 4030

Contact Us

  • Branch Office Address:
    39 Alfred Rewane Road Ikoyi, Lagos.

  • info@ahalasoftware.com

  • +2348037174392

© Copyright 2024. Ahala Software All Rights Reserved