• info@ahalasoftware.com
  • +2348037174392,+1 347 703 4030
Ahala Software
Ahala Software
  • Home
    • Pages
      • Student Registration
      • Instructor Registration
      • FAQs
      • Terms and Conditions
  • Courses
    • Our Courses
    • Courses Grid
      • 3 Columns
      • 4 Columns
    • Become An Instructor
  • Webinars
    • All webinars
  • Blog
    • Blog Page
  • About Us
  • Contact
  • |
  • Login
  • Register
    • Login
    • Register

Salvage crews race against the clock to remove massive chunks of fallen Baltimore bridge

Ahala Software > Blog > News > Salvage crews race against the clock to remove massive chunks of fallen Baltimore bridge
  • April 16, 2024
  • News


SPARROWS POINT, Md. — Nearly three weeks since Baltimore’s Francis Scott Key Bridge collapsed under the impact of a wayward cargo ship, crews are using the largest crane on the Eastern Seaboard to haul the wreckage to a nearby salvage yard.

The heaviest section so far weighed about 450 tons (408 metric tons). In the salvage yard Monday morning, workers disassembled the metal trusses by attacking them with propane torches and a pair of giant shears that sliced them into more manageable pieces. Rising from the water nearby was the Chesapeake 1000, a floating crane with a storied history that includes helping the CIA retrieve part of a sunken Soviet submarine.

The Key Bridge took five years to construct in the 1970s. Now, it’s a race against the clock to dismantle the remnants of a fallen Baltimore landmark.

On March 26, six construction workers plunged to their deaths in the collapse. Four bodies have since been recovered.

Salvage crews are hoping to recover the two remaining bodies once more of the debris has been removed. They’re also working toward their goal of opening a temporary channel later this month that would allow more commercial traffic to resume through the Port of Baltimore, which has remained largely closed since the March 26 collapse. Officials plan to reopen the port’s main channel by the end of May.

So far, over 1,000 tons (907 metric tons) of steel have been removed from the waterway. But the work is tedious, dangerous and incredibly complex, leaders of the operation said Monday during a visit to the salvage yard at Tradepoint Atlantic, the only maritime shipping terminal currently operating in the Port of Baltimore.

The facility, which occupies the site of a former Bethlehem Steel plant northeast of Baltimore, has ramped up operations to accommodate some of the ships originally scheduled to dock at the port’s other terminals.

Before removing any pieces of the bridge, divers are tasked with surveying the murky underwater wreckage and assessing how to safely extract the various parts. Coming up with a roadmap is among the biggest challenges, said Robyn Bianchi, an assistant salvage master on the project.

“There’s a lot of debris, there’s rebar, there’s concrete,” she said. “We don’t know what dangers are down there, so we have to be very methodical and slow with that.”

At the same time, crews are working to remove some containers from the cargo ship Dali before lifting steel spans off its bow and refloating the vessel.

“It presents a dynamic hazard,” said Joseph Farrell, CEO of Resolve Marine, which is working on refloating the ship. He said once that happens, the Dali will return to the Port of Baltimore. “Getting it out of there is a priority.”



Source link

Post navigation

Previous Post
Next Post

Leave A Comment Cancel reply

All fields marked with an asterisk (*) are required

Recent Posts

  • New tax break for auto loans could save some buyers thousands of dollars. But will it boost sales?
  • The biggest piece of Mars on Earth is going up for auction in New York
  • A court called off a key 9/11 suspect’s plea deal. Here’s where the case stands
  • DOGE sprouts in red states, as governors embrace the cost-cutter brand and make it their own
  • Osprey came back from the brink once. Now chicks are dying in nests, and some blame overfishing

Recent Comments

No comments to show.

Archives

  • July 2025
  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024

Categories

  • Entertainment
  • Investment
  • Miscellaneous
  • News
  • Sports
  • World news

Recent Posts

  • New tax break for auto loans could save some buyers thousands of dollars. But will it boost sales?
    July 13, 2025
  • The biggest piece of Mars on Earth is going up for auction in New York
    July 13, 2025
  • A court called off a key 9/11 suspect’s plea deal. Here’s where the case stands
    July 12, 2025

Categories

  • Entertainment
  • Investment
  • Miscellaneous
  • News
  • Sports
  • World news

Archives

  • July 2025
  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024

Meta

  • Register
  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org

Ahala Software

Follow Us

Recent Posts

  • New tax break for auto loans could save some buyers thousands of dollars. But will it boost sales?
    July 13, 2025
  • The biggest piece of Mars on Earth is going up for auction in New York
    July 13, 2025

Contact Us

  • Head Office Address:
    2753 Sexton Place,
    Bronx, New York 10469.
    United States of America.

  • info@ahalasoftware.com

  • +1 347 703 4030

Contact Us

  • Branch Office Address:
    39 Alfred Rewane Road Ikoyi, Lagos.

  • info@ahalasoftware.com

  • +2348037174392

© Copyright 2024. Ahala Software All Rights Reserved