• info@ahalasoftware.com
  • +2348037174392,+1 347 703 4030
Ahala Software
Ahala Software
  • Home
    • Pages
      • Student Registration
      • Instructor Registration
      • FAQs
      • Terms and Conditions
  • Courses
    • Our Courses
    • Courses Grid
      • 3 Columns
      • 4 Columns
    • Become An Instructor
  • Webinars
    • All webinars
  • Blog
    • Blog Page
  • About
  • Contact
  • 0
  • Login
  • |
  • Register
    • Login
    • Register
Ahala Software
  • Home
    • Pages
      • Student Registration
      • Instructor Registration
      • FAQs
      • Terms and Conditions
  • Courses
    • Our Courses
    • Courses Grid
      • 3 Columns
      • 4 Columns
    • Become An Instructor
  • Webinars
    • All webinars
  • Blog
    • Blog Page
  • About
  • Contact

First cargo ship passes through newly opened channel in Baltimore since bridge collapse

Ahala Software > Blog > News > First cargo ship passes through newly opened channel in Baltimore since bridge collapse
  • April 25, 2024
  • News


BALTIMORE — The first cargo ship passed through a newly opened deep-water channel in Baltimore on Thursday after being stuck in the harbor since the Francis Scott Key Bridge collapsed four weeks ago.

The Balsa 94, a bulk carrier sailing under a Panama flag, passed through the new 35-foot (12-meter) channel headed for St. John, Canada.

The ship is one of five stranded vessels expected to pass through the new, temporary channel. On Thursday morning, the vessel moved through the channel guided by two tug boats, one in front and one behind. It passed slowly by the wreckage of the bridge and the Dali, the massive container ship that caused the collapse when it slammed into one of the bridge’s support columns.

The Balsa 94 is expected to arrive in Canada on Monday.

The new channel will remain open until Monday or Tuesday. It will then close again until roughly May 10 while crews work to remove steel from the Dali and refloat the ship, which will then be guided back into the port, officials said earlier this week.

The 35-foot depth is a substantial increase over the three other temporary channels established in recent weeks. It puts the cleanup effort slightly ahead of schedule, as officials previously said they hoped to open a channel of that depth by the end of April.

Five of the seven cargo ships that have been stuck in Baltimore’s harbor will be able to pass through the new channel, including one loaded car carrier, officials said. Other ships are scheduled to enter the port, which normally processes more cars and farm equipment than any other in the country.

The port’s main channel, with a controlling depth of 50 feet (15 meters), is set to reopen next month after the ship has been removed. That will essentially restore marine traffic to normal.



Source link

Post navigation

Previous Post
Next Post

Leave A Comment Cancel reply

All fields marked with an asterisk (*) are required

Recent Posts

  • Mass killings in 2025 in the US hit the lowest level since 2006
  • Pope to visit Christian sites in Lebanon; encourages Christians not to abandon region
  • Suspect in National Guard attack struggled with ‘dark isolation’ as community raised concerns
  • Pope Leo visits iconic Blue Mosque on second day of his trip to Turkey
  • World shares are mixed in holiday-thinned trading with Wall Street closed for Thanksgiving

Recent Comments

No comments to show.

Archives

  • December 2025
  • November 2025
  • October 2025
  • September 2025
  • August 2025
  • July 2025
  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024

Categories

  • Entertainment
  • Investment
  • Miscellaneous
  • News
  • Sports
  • World news

Recent Posts

  • Mass killings in 2025 in the US hit the lowest level since 2006
    December 2, 2025
  • Pope to visit Christian sites in Lebanon; encourages Christians not to abandon region
    December 1, 2025
  • Suspect in National Guard attack struggled with ‘dark isolation’ as community raised concerns
    November 30, 2025

Categories

  • Entertainment
  • Investment
  • Miscellaneous
  • News
  • Sports
  • World news

Archives

  • December 2025
  • November 2025
  • October 2025
  • September 2025
  • August 2025
  • July 2025
  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024

Meta

  • Register
  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org

Ahala Software

Follow Us

Recent Posts

  • Mass killings in 2025 in the US hit the lowest level since 2006
    December 2, 2025
  • Pope to visit Christian sites in Lebanon; encourages Christians not to abandon region
    December 1, 2025

Contact Us

  • Head Office Address:
    2753 Sexton Place,
    Bronx, New York 10469.
    United States of America.

  • info@ahalasoftware.com

  • +1 347 703 4030

Contact Us

  • Branch Office Address:
    39 Alfred Rewane Road Ikoyi, Lagos.

  • info@ahalasoftware.com

  • +2348037174392

© Copyright 2024. Ahala Software All Rights Reserved