• info@ahalasoftware.com
  • +2348037174392,+1 347 703 4030
Ahala Software
Ahala Software
  • Home
    • Pages
      • Student Registration
      • Instructor Registration
      • FAQs
      • Terms and Conditions
  • Courses
    • Our Courses
    • Courses Grid
      • 3 Columns
      • 4 Columns
    • Become An Instructor
  • Webinars
    • All webinars
  • Blog
    • Blog Page
  • About
  • Contact
  • 0
  • Login
  • |
  • Register
    • Login
    • Register
Ahala Software
  • Home
    • Pages
      • Student Registration
      • Instructor Registration
      • FAQs
      • Terms and Conditions
  • Courses
    • Our Courses
    • Courses Grid
      • 3 Columns
      • 4 Columns
    • Become An Instructor
  • Webinars
    • All webinars
  • Blog
    • Blog Page
  • About
  • Contact

New Jersey to allow power plant hotly fought by Newark residents

Ahala Software > Blog > News > New Jersey to allow power plant hotly fought by Newark residents
  • July 18, 2024
  • News


NEWARK, N.J. — In the first major decision issued under an environmental justice law designed to prevent additional sources of pollution in already overburdened communities, New Jersey will allow construction of a backup power plant at one of the country’s largest sewage treatment facilities.

The facility dumped some 840 million gallons of raw sewage into waterways when Superstorm Sandy knocked out electricity in 2012.

Anticipating the fury of environmental and community activists who have fought the project, Shawn LaTourette, the state’s environmental protection commissioner, said his department will require the new facility to use solar panels and battery storage to ensure a net decrease in pollution.

The decision tries to thread the needle between two of New Jersey’s big priorities: protecting the environment, and keeping certain communities from being overburdened with pollution, particularly those where a majority of the population is made up of people of color. That second goal is part of an environmental justice movement taking aim at such projects nationwide.

An important consideration is making sure that raw sewage discharges do not happen again, LaTourette said.

“If there is an outage, we want the sewage treatment plant to run,” he said. “When there’s a power outage, we don’t stop flushing our toilets.”

The decision involves a plan by the Passaic Valley Sewerage Commission for a $180 million backup power project that would kick in during severe storms, power outages or instances of a cyber attack.

Officials from the existing plant, the sixth largest out of 16,000 in the nation, say the backup power source is a critical safeguard against raw sewage entering waterways, or even city streets during a power outage.

But residents of Newark’s heavily industrialized Ironbound section say they already endure more than their fair share of pollution; this would be the fifth power plant to operate in their community.

They have called on Democratic Gov. Phil Murphy’s administration to kill the plan under the environmental justice law he signed with great fanfare in the Ironbound community in 2020.

Matthew Smith, director of the Food & Water Watch environmental group, said the decision “betrays the governor’s promise of clean air for all New Jerseyans.”

“Today’s decision proves that First Lady Tammy Murphy’s stated opposition to the project earlier this year was a thinly veiled ploy to dupe voters into thinking this administration cares about their health and futures,” he said. “Governor Murphy must immediately reverse course and deny this project or watch his green credentials go up in smoke.” Tammy Murphy opposed the planned facility during her brief stint as a candidate for a U.S. Senate seat earlier this year.

LaTourette said the backup plant will be permitted to operate only during emergencies involving the loss of electricity to the site, as well as once a month for testing and maintenance.

The commission will have to install 5 megawatts of solar panels, 5 megawatts of battery storage, additional pollution equipment on sludge treatment boilers, and remove and upgrade older equipment including boilers and generators.

Those conditions should result in a net decrease of pollution from the sewage treatment facility, LaTourette said.

“I don’t expect anyone to praise this outcome,” he said, adding his department has “to achieve a result that best protects public health and the environment, and that is what this does.”

LaTourette said he recognizes that residents will be skeptical if not outright hostile to the decision, given the legacy of pollution sources that were placed in Newark’s Ironbound section, which gets its name from the train tracks surrounding it on three sides.

The backup power plant originally was proposed to run solely on natural gas, which residents say would worsen already poor air quality in the neighborhood. On a recent visit to the site, the stench of sewage hung heavy in the air near giant outdoor treatment tanks. Residents say the smell often travels for miles.

The commission modified the plan to incorporate solar power with burning natural gas. The plan calls for replacing the natural gas component entirely if and when technology advances make it feasible.

A spokesman for the commission said it is reviewing the decision, but noted the project still needs to receive a formal permit before work can commence.

___

Follow Wayne Parry on X at www.twitter.com/WayneParryAC





Source link

Post navigation

Previous Post
Next Post

Leave A Comment Cancel reply

All fields marked with an asterisk (*) are required

Recent Posts

  • Fifth Third Bancorp to buy Comerica for $10.9 billion in tie-up of big regional banks
  • LA City Hall evacuated after car crashes into building’s steps
  • Winning numbers drawn in Friday’s Mega Millions
  • Texas megachurch founder Robert Morris pleads guilty to child sex abuse charges
  • Delta jets have ‘low-speed collision’ on the ground at New York’s LaGuardia

Recent Comments

No comments to show.

Archives

  • October 2025
  • September 2025
  • August 2025
  • July 2025
  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024

Categories

  • Entertainment
  • Investment
  • Miscellaneous
  • News
  • Sports
  • World news

Recent Posts

  • Fifth Third Bancorp to buy Comerica for $10.9 billion in tie-up of big regional banks
    October 6, 2025
  • LA City Hall evacuated after car crashes into building’s steps
    October 5, 2025
  • Winning numbers drawn in Friday’s Mega Millions
    October 4, 2025

Categories

  • Entertainment
  • Investment
  • Miscellaneous
  • News
  • Sports
  • World news

Archives

  • October 2025
  • September 2025
  • August 2025
  • July 2025
  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024

Meta

  • Register
  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org

Ahala Software

Follow Us

Recent Posts

  • Fifth Third Bancorp to buy Comerica for $10.9 billion in tie-up of big regional banks
    October 6, 2025
  • LA City Hall evacuated after car crashes into building’s steps
    October 5, 2025

Contact Us

  • Head Office Address:
    2753 Sexton Place,
    Bronx, New York 10469.
    United States of America.

  • info@ahalasoftware.com

  • +1 347 703 4030

Contact Us

  • Branch Office Address:
    39 Alfred Rewane Road Ikoyi, Lagos.

  • info@ahalasoftware.com

  • +2348037174392

© Copyright 2024. Ahala Software All Rights Reserved